Home Visits, Upazila ICUs and Divisional Cancer Care: Inside Bangladesh’s Health Reform Plan
A record Tk 69,409 crore allocation for health this fiscal year forms part of a far-reaching government plan to rebuild the country’s healthcare system, with upgraded upazila hospitals, home visits by health workers and cancer treatment at divisional level among its main elements. The plan also calls for recruiting doctors and nurses on a large scale and buying modern equipment.
The need for change stems from years of neglect, according to Dr M A Muhit, State Minister for Health and Family Welfare. Irregularities, corruption and mismanagement have left the health infrastructure weak, and many union and upazila facilities have waited years for essential repairs. The government’s response is a coordinated plan to rebuild the whole system instead of a series of standalone projects.
Two projects on the table
Two proposed projects focus on upazila and grassroots care. The first, costing over Tk 44,757.38 crore, would strengthen upazila health complexes between December 2026 and December 2029, expanding beds and services in phases. The state minister said complexes in 503 upazilas would become full-fledged 151-bed hospitals, with plans to add ICUs, coronary care, emergency care, dialysis, child and maternal health services and cancer screening.
The second, at over Tk 11,993 crore, would create 14,634 primary healthcare hubs and 1,631 centres at union and ward level, with improved infrastructure, renovation, modern equipment and necessary facilities.
Health workers at the door
Around 140,000 health workers are to staff these facilities. They will go door to door at least every two months, checking blood pressure and blood sugar, offering basic health advice and sending patients to upazila hospitals when required.
A recruitment drive
Hiring is already moving. The process of recruiting 5,000 doctors and, in the first phase, 30,000 health workers has begun, and an initiative has been taken to hire 2,500 more nurses. Plans for the next five years include 25,000 midwives and 100,000 additional health workers.
Cancer services for all eight divisions
The government has set a target of two to three years for full cancer treatment services in all eight divisions. Plans include procuring 17 linear accelerators and five robotic surgery machines, while a Tk 535.54 crore project has been taken up to establish five Institutes of Nuclear Medicine and Allied Sciences.
Equipment and management
To fill equipment gaps at upazila level, including X-ray and ultrasonography machines, preparations are under way to invite tenders worth around Tk 16,000 crore.
On the management side, Bangladesh’s first health management institute is being established in Savar and is planned to open on January 1. Upazila health and family planning officers and civil surgeons will get special management training.
What will decide success
The aim set out by Dr Muhit is to move healthcare beyond big cities and hospitals and into the homes of marginalised people, which could help narrow long-standing gaps in the system. The focus on prevention, staffing and specialised care at upazila level points in a positive direction. Whether the plan delivers will depend on finishing projects on time, keeping recruitment transparent, managing funds properly and making sure hospitals actually provide effective care.

